Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a bespoke ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://getsocialnetwork.com/story6197691/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2