8m prolonged interlocking 'vee' boards are then nailed and timber lock screwed into the front of the nailing battens, cover boards are necessary on each and every steel posted work, capping and counter rails are more alternatives. There’s an terrible load of bull shit within the DR concerning this, have https://frankl844pqm6.celticwiki.com/user